Understanding LOD in BIM: From LOD 100 to LOD 500
BIM

Understanding LOD in BIM: From LOD 100 to LOD 500

  1. Home
  2. Blog
  3. Understanding LOD in BIM: From LOD 100 to LOD 500

Level of Development (LOD) is one of the most useful – and most misunderstood – concepts in Building Information Modelling. It describes how complete and reliable a model element is at a given point in the project, and it helps everyone agree what the model can be used for.

The five levels at a glance

  • LOD 100 – Concept: massing and symbolic elements used for feasibility and early cost estimates.
  • LOD 200 – Schematic: generic systems with approximate size, shape and location.
  • LOD 300 – Detailed design: accurate geometry suitable for coordination and construction documents.
  • LOD 400 – Fabrication: detailed elements with information required for fabrication and installation.
  • LOD 500 – As-built: field-verified models that represent what was actually constructed.
Specifying the right LOD for each stage avoids paying for detail you do not need – and prevents gaps where you do.

Why it matters

Clear LOD definitions in your BIM Execution Plan reduce disputes, improve coordination and make handover smoother. At CivisTech we agree LOD requirements per discipline and stage before modelling begins, so every deliverable is fit for purpose.


All articles Discuss Your Project